top of page

CEMFLOOR LIQUID SCREED
*It can be pumped on site
*Exceptional thermal conductivity
*Foot trafic after 24-48 hours
​
PREPARITION
A thin layer of plastic sheeting should be placed over insulation and turned up on walls in all rooms. Joints need to be taped and upturns should be fixed 100mm above levels. (this can be trimed after screed is poured)
Cemfloor liquid screed: Services
PROJECTS

.

.

.
Cemfloor liquid screed: Projects
bottom of page